56+ MPH (freely): Alvernon Way north of Los Reales Rd
Current severity is freely
so expect average speeds between 56+ MPH
Accident in Tucson on Alvernon Way north of Los Reales Rd
56+ MPH (freely): Oracle Rd/ St Rt 77 at Magee Rd
Current severity is freely
so expect average speeds between 56+ MPH
Traffic lights not working, caution in Oro Valley on Oracle Rd/ St Rt 77 at Magee Rd
23 - 40 MPH (moderate): I-10 WB between 22Nd St / Starr Pass Blvd ( Exit 259 ) and St Marys Rd ( Exit 257 )
Current severity is moderate
so expect average speeds between 23 - 40 MPH
Slow traffic in Pima on I-10 WB between 22nd St / Starr Pass Blvd ( Exit 259 ) and St Marys Rd ( Exit 257 )
Construction (construction): I-10 EB at I - 8 (Exit 199)
Construction closure--connecting ramp to nb i-10 on I-10 EB at I - 8 (Exit 199)
Construction (construction): W Magee Rd east of AZ-77/N Oracle Rd
Paving operations. lane restrictions in Pima on W Magee Rd east of AZ-77/N Oracle Rd
Construction (construction): Hacienda Del Sol Rd from River Rd to Sunrise Dr
Paving operations. lane restrictions in Tucson on Hacienda Del Sol Rd from River Rd to Sunrise Dr
Construction (construction): Pontatoc Rd from Sunrise Drive to River Rd
Paving operations. lane restrictions in Tucson on Pontatoc Rd from Sunrise Drive to River Rd
Construction (construction): Valencia Rd from Wilmot Rd to Kolb Rd
Road construction. lane restrictions in Tucson on Valencia Rd from Wilmot Rd to Kolb Rd as reported by dot
Construction (construction): I-10 WB at Picacho Peak Rd ( Exit 219 )
Road construction. exit ramp closed in Picacho Peak on I-10 WB at Picacho Peak Rd ( Exit 219 )
Construction (construction): Naranja Dr west of La Cholla Blvd
Closed due to road construction in Oro Valley on Naranja Dr west of La Cholla Blvd
Construction (construction): Wilmot Rd (South) Both NB/SB under I 10
New road construction layout in Tucson on Wilmot Rd (South) Both NB/SB under I 10
Construction (construction): Broadway Blvd Both EB/WB between Camino Seco and Houghton Rd
Road construction, right lane closed in Tucson on Broadway Blvd Both EB/WB between Camino Seco and Houghton Rd
0 - 10 MPH (extreme): I - 19 SB at Ajo Way ( Exit 99 )
Current severity is extreme
so expect average speeds between 0 - 10 MPH
Road construction. on-ramp closed in Pima on I - 19 SB at Ajo Way ( Exit 99 ) as reported by n/a
Currently no items.