Currently no items.
Currently no items.
Construction (construction): I-96 WB after Alden Nash Ave/ M-50 / Lowell Exit 52
Road construction, shoulder closed in Lowell on I-96 WB after Alden Nash Ave/ M-50 / Lowell Exit 52 as reported by mdot
Construction (construction): I-96 EB at East Beltline
Off-ramp closed on I-96 EB at East Beltline as reported by mdot
Construction (construction): Airline Rd Both NB/SB between E Hile Rd and East Lake Rd
Construction work in Muskegon on Airline Rd Both NB/SB between E Hile Rd and East lake Rd as reported by mdot
Construction (construction): I-94 WB at Elm Rd/Exit 141
On-ramp closed in Jackson on I-94 WB at Elm Rd/Exit 141
Construction (construction): I-94 EB between M-60/Exit 136 and Sargent Rd/145
Road construction in Jackson on I-94 EB between M-60/Exit 136 and Sargent Rd/145
0 - 10 MPH (extreme): I-196 EB at Ottawa Ave
Current severity is extreme
so expect average speeds between 0 - 10 MPH
Off-ramp closed on I-196 EB at Ottawa Ave as reported by mdot
Construction (construction): M-311 / 11 Mile Rd Both NB/SB at Kalamazoo River
Bridge closed in Battle Creek on M-311 / 11 Mile Rd Both NB/SB at Kalamazoo River as reported by mdot
Currently no items.